- Finish the Single Girl quilt. To be fair, this isn't hugely taxing as the only thing left to do is hand sew the binding down.
- The Liberty HST quilt. I'm in the process of growing this from a baby quilt top into a double quilt.
- Summerville flying geese quilt. This is the big challenge, as it's really not a lot bigger than it was in the picture below, taken a month or so ago. I'd like it finished soon after we move though.
- A Spring Carnival Pillow. Hoping to have it done to put on the bed with the Liberty HST quilt.
You know, I think that's plenty to be going on with for now. I have half a dozen smaller projects (bee blocks, another pillow, an English paper piecing kit, among others), but those up there are the big four. Particularly the Summersville quilt. Eeep. I'm nervous after putting a deadline on it, but not nearly as much as I have been since I faced the reality of my WIP list last week. Ugh. Definitely time to get finishing. Before the end of September.
What are you hoping to achieve before autumn sets in properly?




